Need an urgent response?
Standing five and six storeys high, the property was constructed by McLaren from a rigid concrete frame clad with brick and stone.
It boasts ample glazing that breathes light and spaciousness into the building.
TRC was awarded the contract to design, manufacture and install a total of 165 double-glazed timber tilt & turn windows, French doors and single doors, proving that the classic choice of timber is well suited to such a modern design.